New rear elevation.
Internal blockwork wall is now built up to take the roof timbers.
A few pictures showing how the old wall steps back after the steel.
I think this step back in the wall will be covered over by the kitchen units
and so wont be too noticeable.
And the same on the other side.
On this side, the walls are in line, however the steel beam will need to be boxed in.
No comments:
Post a Comment