Monday, July 18, 2011
Latest pics...
A quick update on how everything is progressing. So far the kitchen is complete, shower room & toilet are all installed. the walls have all had a mist coat and first coat of colour. Our timber flooring is currently being installed. Once fitted, the skirting boards can be fitted and the painting completed.
New cupboards with flush closing doors fitted into the old fireplace.
Boxing in of heating pipes which used to be hidden in the old cupboard.
Washing machine just fitted in the old larder / cupboard under the stair.
Friday, June 17, 2011
Pics taken on 14th to 17th June...
A quick look at the kitchen being assembled...
Hmm... the difficult 'chop around the column' area....
Mind yer head!
Units and dishwasher installed!
Eh?! How'd that get there?
Worktop fitted!
Pics taken on 11th June...
And then the Rogue Traders appeared on site!
Hard work!!!
Although by the time they finished it looked pretty good!
Pics taken on 7th June...
Shower room all plastered + lights and extractor fan installed...
Allies 600 x 600 floor tiles arrive...
A quick shot of the window sticker...
Not a particularly exciting day.
Pics taken on 4th June...
The partition has now been removed and work has begun on the dining room.
Now the room is totally open, you can get an real idea of how the space is going to look!
Opening left at the bottom of the column for rodding access to drains.
Access to shower valves.
The old fire place gets removed.
The concrete slab was too tough to knock out by hand so they're going to smash it up with the Kango!
p.s.
A Kango is one of these...
In order to save a bit of a bit of cash we have been making up the kitchen carcasses (carcii?) ourselves.
AH "5 minute job!"